日本老熟妇在线视频_国产剧情普通话对白av_先锋影音网站资源每日_av小次郎网站

中投顧問(wèn)
中投顧問(wèn)

24小時(shí)免費(fèi)服務(wù)熱線400-008-1522

Investment & Forecast Report on China Hydropower Industry, the Year of 2024-2028

首次出版:最新修訂:November 2013交付方式:特快專(zhuān)遞(2-3天送達(dá))

報(bào)告屬性:共0頁(yè)下載目錄 版權(quán)聲明

定購(gòu)電話:0755-82571522、82571566、400-008-1522

24小時(shí)服務(wù)熱線:138 0270 8576 定制報(bào)告

版本 在線版 電子版+印刷版 在線報(bào)告庫(kù)(超1000份報(bào)告)全庫(kù)
優(yōu)惠價(jià) RMB 6800 RMB 7800 RMB 9800
原價(jià) RMB 9600 RMB 9800 -

立即訂購(gòu) 加入購(gòu)物車(chē) QQ咨詢 在線客服

限時(shí)特惠,降價(jià)還增量!

讓您輕松實(shí)現(xiàn)"讀報(bào)告自由"!

在線報(bào)告庫(kù)有超1000份報(bào)告,

全庫(kù)只需9800元,平均每份報(bào)告僅需9.8元!

查看千份報(bào)告清單 > 立即訂購(gòu)在線報(bào)告庫(kù) >

X

申請(qǐng)?jiān)囉?/h1>

請(qǐng)完善以下信息,我們顧問(wèn)會(huì)在一個(gè)工作日內(nèi)與您聯(lián)系

*姓名

*手機(jī)號(hào)

*政府/園區(qū)/機(jī)構(gòu)/企業(yè)名稱(chēng)

您的職務(wù)

您的郵箱

備注

立即申請(qǐng)

X

您的需求已經(jīng)提交!

如果您希望盡早試用體驗(yàn),也可以直接聯(lián)系我們。

聯(lián)系電話:   400 008 0586;   0755-82571568

微信掃碼:   掃碼咨詢

報(bào)告目錄內(nèi)容概述 定制報(bào)告

CHAPTER 1 RELATED OVERVIEW OF THE HYDROPOWER INDUSTRY
  1.1 Definition of hydropower industry
    1.1.1 Definition of hydropower
    1.1.2 Characteristics of hydropower
    1.1.3 Classification of hydropower station
  1.2 The concept and definition of small hydropower
    1.2.1 Meaning and resources of small hydropower
    1.2.2 Classification of small hydropower
    1.2.3 The characteristics and advantages of small hydropower
  1.3 Introduction of Chinese hydropower resources
    1.3.1 Chinese reserves of hydropower resources
    1.3.2 Characteristics of Chinese hydropower resources
    1.3.3 Status of hydropower resources in China’s energy system
CHAPTER 2 ANALYSIS OF DEVELOPMENT OF INTERNATIONAL HYDROPOWER INDUSTRY DEVELOPMENT FROM 2011 TO 2013
  2.1 Development overview of the global hydropower industry from 2011 to 2013
    2.1.1 Sustainable development of the world requires hydropower development
    2.1.2 Development review of the global hydropower industry in 2010
    2.1.3 Global hydropower increases from 2011 to 2012
    2.1.4 Analysis of global water consumption in 2012
  2.2 Analysis of hydropower development in Europe
    2.2.1 Development review of European hydropower market
    2.2.2 Hydroelectric project has achieved growth in the UK
    2.2.3 French hydroelectric capacity status
    2.2.4 Austrian hydropower development plan
    2.2.5 Development and prospects of hydropower resources in Russia
  2.3 Hydropower development in Asian countries
    2.3.1 The Japanese government has formulated policy to promote the development of hydropower construction
    2.3.2 Overview of the hydropower industry in Pakistan
    2.3.3 Armenia small hydropower industry is flourishing
    2.3.4 Myanmar vigorously develops hydropower to solve the power shortage
  2.4 Analysis of hydropower development in other regions
    2.4.1 Uganda will increase investment in hydropower projects
    2.4.2 The African Union will actively promote the development of hydropower projects
    2.4.3 Development status of Chilean hydropower
    2.4.4 South American Itaipu hydropower station had highest generating capacity in the world in 2012
    2.4.5 Canadian hydropower project investment status in future
    2.4.6 The world’s largest hydropower project will launch in 2015
CHAPTER 3 OVERVIEW OF HYDROPOWER RESOURCES OF CHINA’S MAJOR RIVERS
  3.1 The Yangtze River
    3.1.1 General overview
    3.1.2 Hydropower resources
    3.1.3 Types of tributaries
    3.1.4 The Jinsha River
    3.1.5 The Yalong River
    3.1.6 The Tuo River
    3.1.7 The Min River
    3.1.8 The Jialing River
    3.1.9 The Wu River
    3.1.10 The Yuan River
    3.1.11 The Xiang River
    3.1.12 The Han River
    3.1.13 The Gan River
  3.2 The Yellow River
    3.2.1 Overview of the Yellow River
    3.2.2 Yellow River tributary
    3.2.3 Yellow River upstream hydropower development status
    3.2.4 Yellow River upstream hydropower planning
    3.2.5 Hydropower planning in middle of Yellow River
    3.2.6 Suggestions
  3.3 The Pearl River
    3.3.1 General overview
    3.3.2 Hydropower development status
    3.3.3 Pearl River tributaries
    3.3.4 Development planning
  3.4 Rivers in the border of Southwest China
    3.4.1 The Yarlung Zangbo River
    3.4.2 The Nu River
    3.4.3 Lantsang River
CHAPTER 4 COMPREHENSIVE ANALYSIS OF CHINESE HYDROPOWER INDUSTRY FROM 2011 TO 2013
  4.1 Overview of China’s hydropower industry
    4.1.1 The significance of China to develop hydropower
    4.1.2 The course of development of hydropower
    4.1.3 The total installed capacity of hydropower in China ranked first in the world
    4.1.4 China’s hydropower has made great economic and social contribution
  4.2 Analysis of development of China’s hydropower industry from 2011 to 2013
    4.2.1 Analysis of the hotpot of China’s hydropower industry in 2011
    4.2.2 China’s hydropower development and construction status in 2012
    4.2.3 Overview of China’s hydropower consumption in 2012
    4.2.4 Analysis of the hotpot of China’s hydropower industry in 2012
    4.2.5 Overview of hydropower industry development from January to May 2013
  4.3 Analysis of Chinese hydroelectric yields from 2010 to 2012
    4.3.1 Analysis of hydropower yield of national and major provinces from January to December 2010
    4.3.2 Analysis of hydropower yield of national and major provinces from January to December 2011
    4.3.3 Analysis of hydropower yield of national and major provinces from January to December 2012
  4.4 Analysis of hydropower development situation from 2011 to 2013
    4.4.1China promulgated policies to strengthen management of hydropower construction in 2011
    4.4.2 China implemented the new hydropower development regulations in 2011
    4.4.3 Ministry of Environmental Protection issued a notice to regulate hydropower development in early 2012
    4.4.4 Ministry of Environmental Protection clear guidelines for hydropower development in 2012
    4.4.5 In 2013, China proposed to actively develop hydropower
    4.4.6 In 2013, the Ministry of Water Resources proposed to strengthen the construction of rural hydropower
  4.5 Construction status of key hydropower projects from 2011 to 2013
    4.5.1 In 2011, the Dadu River Houziyan Hydropower Station started construction
    4.5.2 In 2012, the largest hydropower station in Sichuan Tibetan area put into operation
    4.5.3 In 2012, the Three Gorges Hydropower Station units all entered commercial operation
    4.5.4 In 2012, the first batch of units of Xiangjiaba Hydropower Station officially generated electricity
    4.5.5 In 2013, Xinjiang Kushi Tayi Hydropower Station went into full production
    4.5.6 In 2013, Yalong River Guandi Hydropower Station entered commercial operation
    4.5.7 In 2013, Jinsha River Xiluodu Hydropower Station put into operation
  4.6 Analysis of China’s small hydropower development from 2011 to 2013
    4.6.1 Small hydropower’ s position in the national economy
    4.6.2 Overview of construction and development status of small hydropower in China
    4.6.3 China’s small hydropower construction has ushered in development opportunities
    4.6.4 China promotes construction of small hydropower generation fuel project
  4.7 Analysis of river basin hydropower development
    4.7.1 Analysis of river basin hydropower development principles
    4.7.2 River basin hydropower development and management experience
    4.7.3 River basin hydropower comprehensive development mode
    4.7.4 Hydropower cascade development of river basin should be innovated
    4.7.5 The overall development of single mian basin is conducive to the basin hydropower development
  4.8 The problems in the development of China’s hydropower industry
    4.8.1 China’s hydropower development deficiencies
    4.8.2 The main problem of China’s hydropower industry
    4.8.3 The constraints of China’s hydropower development should be solved
  4.9 Analysis of development strategy of China’s hydropower industry
    4.9.1 The fast and effective development methods of China’s hydropower industry
    4.9.2 Using sustainable development concept to promote the scientific development of China’s hydropower
    4.9.3 China’s hydropower industry international development strategy
    4.9.4 New institutional mechanisms promotes sustainable development of hydropower
CHAPTER 5 ANALYSIS OF FINANCIAL SITUATION OF HYDROPOWER INDUSTRY IN CHINA
  5.1 Economic scale of hydropower industry in China
    5.1.1Sales revenue of hydropower industry in China between 2008 and 2012
    5.1.2 Total profit of hydropower industry in China between 2008 and 2012
    5.1.3 Total assets of hydropower industry in China between 2008 and 2012
  5.2 Profitability of hydropower industry in China
    5.2.1 Loss suffering ratio of hydropower industry in China between 2008 and 2012
    5.2.2 Gross margin of hydropower industry in China between 2008 and 2012
    5.2.3 Cost-profit ratio of hydropower industry in China between 2008 and 2012
    5.2.4 Sales-profit ratio of hydropower industry in China between 2008 and 2012
  5.3 Operating capacity of hydropower industry in China
    5.3.1 Receivables turnover ratio of hydropower industry in China between 2008 and 2012
    5.3.2 Current assets turnover ratio of hydropower industry in China between 2008 and 2012
    5.3.3 Total asset turnover ratio of hydropower industry in China between 2008 and 2012
  5.4 Solvency of hydropower industry in China
    5.4.1 Assets-liability ratio of hydropower industry in China between 2008 and 2012
    5.4.2 Interest cover of hydropower industry in China between 2008 and 2012
  5.5 Comprehensive appraisal of the financial status of the hydropower industry in China
    5.5.1 Comprehensive appraisal of the financial status of the hydropower industry in China
    5.5.2 Analysis of the economic factors affecting the financial status of hydropower industry in China
CHAPTER 6 ANALYSIS OF DEVELOPMENT OF RURAL HYDROPOWER ELECTRIFICATION IN CHINA FROM 2011 TO 2013
  6.1 Overview of China’s rural hydropower electrification development from 2011 to 2013
    6.1.1 Construction background of China’s rural hydropower electrification
    6.1.2 Review of construction achievements of China’s rural hydropower electrification
    6.1.3 Development of China’s rural hydropower electrification in 2011
    6.1.4 Development of China’s rural hydropower electrification in 2012
    6.1.5 In 2012, China regulated rural hydropower electrification project management
    6.1.6 Future development of China’s new rural hydropower electrification
  6.2 Layout planning and construction scale of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
    6.2.1 Layout planning
    6.2.2 The scope of planning
    6.2.3 Principles for determining the project
    6.2.4 Construction scale
  6.3 Regional planning of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
    6.3.1 Planning of the Southwest area
    6.3.2 Planning of the Northwest area
    6.3.3 Planning of the Northeast area
    6.3.4 Planning of the Central area
    6.3.5 Planning of the Southeast coastal area
  6.4 Planning of management system and operation mechanism of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
    6.4.1 Management system
    6.4.2 Operation mechanism
    6.4.3 State-owned assets management
  6.5 Investment estimation and benefit analysis of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
    6.5.1 Investment estimation
    6.5.2 Financing
    6.5.3 Benefit analysis
  6.6 Problems in and solutions of the development of China’s rural hydropower electrification
    6.6.1 The main problems in the construction of China’s rural hydropower electrification
    6.6.2 The main countermeasures in the construction of China’s rural hydropower electrification
    6.6.3 The impact of China rural hydropower electrification development on the environment and its countermeasures
    6.6.4 Safeguards of China rural hydropower electrification development
CHAPTER 7 DEVELOPMENT OF HYDROPOWER INDUSTRY IN MAJOR REGIONS OF CHINA FROM 2011 TO 2013
  7.1 Sichuan
    7.1.1 Sichuan hydropower industry development status in 2012
    7.1.2 Development goals of Sichuan hydropower industry in 2013
    7.1.3 Sichuan Aba Prefecture continues to accelerate hydropower development during the “Twelfth Five-Year Planning” period
    7.1.4 Mianyang hydropower project investment planning during the “Twelfth Five-Year Planning” period
    7.1.5 Future development proposals in Sichuan hydropower industry
  7.2 Yunnan
    7.2.1 Immigration and investment status of major hydropower projects in Yunnan in 2011
    7.2.2 Yunnan hydropower construction maintained stable development in 2012
    7.2.3 Yunnan Province introduced new policy to develop small hydropower in 2012
    7.2.4 Yunnan rural hydropower expansion and transformation plan has been approved in 2013
    7.2.5 Prospects of Yunnan new rural hydropower electrification during the “Twelfth Five-Year Planning” period
  7.3 Guizhou
    7.3.1 Small hydropower development in Guizhou Province in 2011
    7.3.2 Overview of hydropower construction in Guizhou Province in 2012
    7.3.3 Measures for Guizhou rural hydropower industry to accelerate the development
    7.3.4 Guizhou new rural hydropower installed target during the “Twelfth Five-Year Planning” period
  7.4 Other provinces
    7.4.1 Anhui
    7.4.2 Guangdong
    7.4.3 Guangxi
    7.4.4 Jiangxi
    7.4.5 Heilongjiang
    7.4.6 Zhejiang
    7.4.7 Chongqing
    7.4.8 Fujian
    7.4.9 Hebei
    7.4.10 Shaanxi
CHAPTER 8 ANALYSIS ON MANAGEMENT OF CHINA’S HYDROPOWER DEVELOPMENT AND CONSTRUCTION FROM 2011 TO 2013
  8.1 Analysis on the management of hydropower exploration project
    8.1.1 The nature of enterprise project management
    8.1.2 Management mode of hydropower exploration and design project
    8.1.3 Three phases of management of hydropower exploration and design project
    8.1.4 Development ideas of management of hydropower exploration and design project
  8.2 Analysis of the quality management of hydropower projects
    8.2.1 Current situation of China’s hydropower project quality management
    8.2.2 Problems in quality management of hydropower engineering
    8.2.3 Recommendations to strengthen the hydropower project quality management
  8.3 Hydropower project resettlement policy
    8.3.1 Hydropower project resettlement content
    8.3.2 Problems in the land acquisition and resettlement of Chinese hydropower project
    8.3.3 Theoretical framework of the design and innovation of China’s hydropower project resettlement institution
    8.3.4 Specific recommendations of the design and innovation of China’s hydropower project resettlement institution
  8.4 Analysis of safety supervision of hydropower development enterprise
    8.4.1 Background of safety supervision of hydropower development enterprise
    8.4.2 Problems in safety supervision of China’s hydropower construction projects
    8.4.3 China’s countermeasures to strengthen safety supervision over hydropower construction project owners
CHAPTER 9 RESEARCH ON HYDROPOWER TECHNOLOGY FROM 2011 TO 2013
  9.1 Technical analysis of hydropower units
    9.1.1 Analysis of capacity-plus transformation technology for hydropower generator
      hydroelectric turbine generator set Rehabilitation Technical Analysis
    9.1.2 Analysis of hydraulic turbine composite antiwear plate and pump composite antiwear seal rings technology
    9.1.3 Technical analysis of hydroelectric generating excitation device
    9.1.4 The cavitation erosion-resistant protective technology of metallic materials for turbine and pump
    9.1.5 The cavitation erosion-resistant protective technology of non-metallic materials for turbine and pump
    9.1.6 Technical analysis of micro hydro generating units (including load regulator)
    9.1.7 Analysis of overspeed protection technology of rural hydropower station
  9.2 Analysis of small hydropower technology
    9.2.1 Analysis of renovation technology of small hydropower station
    9.2.2 Analysis of runoff calculation technology of small hydropower projects
    9.2.3 Analysis of free-pressure tunnel water diversion technology of small hydropower station
    9.2.4 Small hydropower station technology transformation needs to be strengthened
    9.2.5 New technology development trends of small hydropower equipment
  9.3 Small hydropower station computer monitoring technology systems
    9.3.1 The implementation status of computer monitoring system in small hydropower station
    9.3.2 The implementation problems of computer monitoring system in small hydropower station
    9.3.3 Operating personnel is lack of technical force
  9.4 Analysis of China’s rural hydropower automation
    9.4.1 Review of the rural hydropower automation development
    9.4.2 Analysis of rural hydropower automation status
    9.4.3 Analysis of rural hydropower station computer monitoring system structure and main equipment selection
    9.4.4 Hydropower automation transformation case study (Hubei Weijiazhou Hydropower Station)
    9.4.5 Hydropower automation transformation case study (Hunan Yushi Hydropower Station)
    9.4.6 Development strategy for China’s rural hydropower station automation
CHAPTER 10 ANALYSIS OF DEVELOPMENT OF HYDROPOWER EQUIPMENT INDUSTRY FROM 2011 TO 2013
  10.1 Overview of development of hydropower equipment industry from 2011 to 2013
    10.1.1 China’s hydropower equipment significantly increased the domestic level
    10.1.2 Development status of China’s hydropower equipment industry
    10.1.3 Hydropower equipment utilization time status from January to May, 2013
    10.1.4 Development of hydropower equipment market in good momentum
    10.1.5 Large hydropower equipment manufacturing industry achieved breakthrough
  10.2 Analysis of small hydropower equipment market from 2011 to 2013
    10.2.1 Overview of China’s small hydropower equipment market
    10.2.2 Opportunities and challenges of China’s small hydropower equipment industry coexist
    10.2.3 Development situation of China’s small hydropower equipment market is grim
    10.2.4 Development strategies of small hydropower equipment manufacturing enterprises
  10.3 Analysis of yields of China’s hydroelectric generating set from 2010 to 2012
    10.3.1 Analysis of yields of hydroelectric generating set in the whole country and major provinces from January to December 2010
    10.3.2 Analysis of yields of hydroelectric generating set in the whole country and major provinces from January to December 2011
    10.3.3 Analysis of yields of hydroelectric generating set in the whole country and major provinces from January to December 2012
  10.4 Challenges and countermeasures of hydropower equipment industry
    10.4.1 Problems in Chinese hydropower equipment industry
    10.4.2 Risks and impacts of China’s hydropower equipment industry
    10.4.3 Development proposals of Chinese hydropower equipment industry
    10.4.4 Innovation is the most important for hydropower equipment manufacturing enterprises
  10.5 Outlook of China’s hydropower equipment industry
    10.5.1 Chinese hydropower equipment market has a broad future
    10.5.2 Chinese hydropower equipment will usher in the great leap forward development
    10.5.3 The development focus of China’s hydropower equipment industry in the future
CHAPTER 11 ANALYSIS OF INVESTMENT AND FINANCING OF HYDROPOWER INDUSTRY
  11.1 Investment and financing opportunities and risks of Chinese hydropower industry
    11.1.1 China encourages and supports private capital investment in electricity
    11.1.2 China’s hydropower development and construction are facing new opportunities
    11.1.3 China’s financial support for rural hydropower reform in 2013
    11.1.4 In 2013, financial institutions supported the construction of small hydropower
    11.1.5 Investment opportunities exist in hydropower equipment field
    11.1.6 Financing prospects of China’s hydropower construction
    11.1.7 Investment risks of hydropower industry
  11.2 Analysis of China’s hydropower BOT Financing
    11.2.1 Overview of BOT financing
    11.2.2 Feasibility analysis of China’s hydropower using BOT financing
    11.2.3 Advantage of BOT financing in hydropower project
    11.2.4 Problems of using BOT financing in hydropower development
  11.3 Major issues of investment and financing of Chinese hydropower industry to be addressed
    11.3.1 Relationship between hydropower development and environmental protection
    11.3.2 Investment benefit protection of hydropower enterprises
    11.3.3 The establishment of relatively open hydropower investment market
    11.3.4 Selection of hydropower investment and development mode
    11.3.5 The establishment of an effectively competitive hydropower development model
    11.3.6 Optimal combination of hydro financing structure
    11.3.7 The balance between the interests of hydropower investment
  11.4 Investment and development countermeasures of China’s hydropower industry
    11.4.1 Establishment of lively hydropower investment management system
    11.4.2 Introduction of strategic investors to ease capital shortage
    11.4.3 focus on the guarantee of hydropower intensive development
    11.4.4 adjustment and optimization of the debt structure of construction funds
    11.4.5 further broaden the financing methods and channels
    11.4.6 Establish the mechanism for guidance and inspirtion of hydropower investment expansion
    11.4.7 Formation of “multi-lifted” investment allocation and cooperation mechanisms
    11.4.8 Investment in hydropower development should be shifted to the Tibetan Plateau
CHAPTER 12 PROSPECTS AND DEVELOPMENT TRENDS OF HYDROPOWER INDUSTRY
  12.1 Prospect of hydropower industry
    12.1.1 China’s hydropower development has a broad space for development
    12.1.2 China’s hydropower industry will continue sustained and rapid development
    12.1.3 Prospects of China’s rural hydropower in the future
    12.1.4 Hydropower development in western China will enter a new phase
  12.2 The “Twelfth Five-Year Planning” of hydropower development
    12.2.1 Development situation
    12.2.2 Guidelines and objectives
    12.2.3 Key tasks
    12.2.4 Planning and implementation
    12.2.5 Analysis of Investment estimation and social environment influence
  12.3 CIConsulting’s prediction of the development of Chinese hydropower industry from 2013 to 2017
    12.3.1 Analysis of the factors affecting the development of hydropower industry
    12.3.2 CIConsulting’s prediction of the revenue of Chinese hydropower industry from 2013 to 2017
    12.3.3 CIConsulting’s prediction of the profit of Chinese hydropower industry from 2013 to 2017
    12.3.4 CIConsulting’s prediction of the output value of Chinese hydropower industry from 2013 to 2017
    12.3.5 CIConsulting’s prediction of the yield of Chinese hydropower industry from 2013 to 2017
    12.3.6 CIConsulting’s prediction of total installed capacity of China’s hydropower from 2013 to 2017
CHAPTER 13 OPERATING ANALYSIS OF KEY HYDROPOWER ENTERPRISES
  13.1 China Yangtze Power Co., Ltd.
    13.1.1 Development condition between 2006 and 2012
    13.1.2 Overall size and profitability
    13.1.3 Analysis of solvency
    13.1.4 Analysis of operating capacity
    13.1.5 Analysis of profitability
    13.1.6 Analysis of growth capacity
  13.2 Huanghe Hydropower Development Co. Ltd.
    13.2.1 Development condition between 2006 and 2012
    13.2.2 Overall size and profitability
    13.2.3 Analysis of solvency
    13.2.4 Analysis of operating capacity
    13.2.5 Analysis of profitability
    13.2.6 Analysis of growth capacity
  13.3 Longtan Hydropower Development Co. Ltd.
    13.3.1 Development condition between 2006 and 2012
    13.3.2 Overall size and profitability
    13.3.3 Analysis of solvency
    13.3.4 Analysis of operating capacity
    13.3.5 Analysis of profitability
    13.3.6 Analysis of growth capacity
  13.4 Guizhou Wujiang Hydropower Development Co., Ltd.
    13.4.1 Development condition between 2006 and 2012
    13.4.2 Overall size and profitability
    13.4.3 Analysis of solvency
    13.4.4 Analysis of operating capacity
    13.4.5 Analysis of profitability
    13.4.6 Analysis of growth capacity
  13.5 Wuling Power Co., Ltd.
    13.5.1 Development condition between 2006 and 2012
    13.5.2 Overall size and profitability
    13.5.3 Analysis of solvency
    13.5.4 Analysis of operating capacity
    13.5.5 Analysis of profitability
    13.5.6 Analysis of growth capacity
  13.6 Yalong River Hydropower Development Co., Ltd.
    13.6.1 Development condition between 2006 and 2012
    13.6.2 Overall size and profitability
    13.6.3 Analysis of solvency
    13.6.4 Analysis of operating capacity
    13.6.5 Analysis of profitability
    13.6.6 Analysis of growth capacity
  13.7 Huaneng Lancang River Hydropower Co., Ltd. (Guandu Region)
    13.7.1 Development condition between 2006 and 2012
    13.7.2 Overall size and profitability
    13.7.3 Analysis of solvency
    13.7.4 Analysis of operating capacity
    13.7.5 Analysis of profitability
    13.7.6 Analysis of growth capacity
  13.8 Hubei Qingjiang Hydropower Development Co., Ltd.
    13.8.1 Development condition between 2006 and 2012
    13.8.2 Overall size and profitability
    13.8.3 Analysis of solvency
    13.8.4 Analysis of operating capacity
    13.8.5 Analysis of profitability
    13.8.6 Analysis of growth capacity
  13.9 East China Tianhuangping Pumped Storage Power Co., Ltd.
    13.9.1 Development condition between 2006 and 2012
    13.9.2 Overall size and profitability
    13.9.3 Analysis of solvency
    13.9.4 Analysis of operating capacity
    13.9.5 Analysis of profitability
    13.9.6 Analysis of growth capacity
  13.10 Sichuan Baozhusi Hydropower Plant of China Huadian Gorporation
    13.10.1 Development condition between 2006 and 2012
    13.10.2 Overall size and profitability
    13.10.3 Analysis of solvency
    13.10.4 Analysis of operating capacity
    13.10.5 Analysis of profitability
    13.10.6 Analysis of growth capacity
  13.11 Huanghe Hydropower Development Co., Ltd. (Xiaolangdi Construction Bureau)
    13.11.1 Development condition between 2006 and 2012
    13.11.2 Overall size and profitability
    13.11.3 Analysis of solvency
    13.11.4 Analysis of operating capacity
    13.11.5 Analysis of profitability
    13.11.6 Analysis of growth capacity
  13.12 Guodian Daduhe Company Jizui Hydropower Generation Plant
    13.12.1 Development condition between 2006 and 2012
    13.12.2 Overall size and profitability
    13.12.3 Analysis of solvency
    13.12.4 Analysis of operating capacity
    13.12.5 Analysis of profitability
    13.12.6 Analysis of growth capacity
  13.13 Fujian Shuikou Power Generation Group Co., Ltd.
    13.13.1 Development condition between 2006 and 2012
    13.13.2 Overall size and profitability
    13.13.3 Analysis of solvency
    13.13.4 Analysis of operating capacity
    13.13.5 Analysis of profitability
    13.13.6 Analysis of growth capacity
  13.14Guotou Yunnan Dachaoshan Hydropower Company Limited (Wuhua Region)
    13.14.1 Development condition between 2006 and 2012
    13.14.2 Overall size and profitability
    13.14.3 Analysis of solvency
    13.14.4 Analysis of operating capacity
    13.14.5 Analysis of profitability
    13.14.6 Analysis of growth capacity
  13.15 Hubei Qingjiang Hydropower Development Co., Ltd. (Shuibuya)
    13.15.1 Development condition between 2006 and 2012
    13.15.2 Overall size and profitability
    13.15.3 Analysis of solvency
    13.15.4 Analysis of operating capacity
    13.15.5 Analysis of profitability
    13.15.6 Analysis of growth capacity
  13.16 Guizhou Qianyuan Power Co., Ltd.
    13.16.1 Development condition between 2006 and 2012
    13.16.2 Overall size and profitability
    13.16.3 Analysis of solvency
    13.16.4 Analysis of operating capacity
    13.16.5 Analysis of profitability
    13.16.6 Analysis of growth capacity
  13.17 Datang Yantan Hydropower Co., Ltd.
    13.17.1 Development condition between 2006 and 2012
    13.17.2 Overall size and profitability
    13.17.3 Analysis of solvency
    13.17.4 Analysis of operating capacity
    13.17.5 Analysis of profitability
    13.17.6 Analysis of growth capacity
  13.18 Hanjiang hydropower (Group) Co., Ltd.
    13.18.1 Development condition between 2006 and 2012
    13.18.2 Overall size and profitability
    13.18.3 Analysis of solvency
    13.18.4 Analysis of operating capacity
    13.18.5 Analysis of profitability
    13.18.6 Analysis of growth capacity
  13.19 Tianshengqiao-ⅠHydro-Power Development Co., Ltd.
    13.19.1 Development condition between 2006 and 2012
    13.19.2 Overall size and profitability
    13.19.3 Analysis of solvency
    13.19.4 Analysis of operating capacity
    13.19.5 Analysis of profitability
    13.19.6 Analysis of growth capacity
  13.20 Sichuan Huaneng Baoxing Power Co., Ltd.
    13.20.1 Development condition between 2006 and 2012
    13.20.2 Overall size and profitability
    13.20.3 Analysis of solvency
    13.20.4 Analysis of operating capacity
    13.20.5 Analysis of profitability
    13.20.6 Analysis of growth capacity
APPENDIX
Appendix 1: Water Law of People’s Republic of China
Appendix 2: Electricity Law of People’s Republic of China
Appendix 3: Interim Measures for Water Storage Safety Appraisal of Hydropower Construction Project
Appendix 4: Provisional Regulations on Procedures Management of Water Conservancy Project Construction
Appendix 5: Measures for Price Administration of Water Supply of Water Engineering
Appendix 6: Regulations of dam operating safety management of hydropower station
Appendix 7: Hydropower Project Budget Estimate Adjustments Management Approach (for Trial Implementation)
Appendix 8: Administration Approach of Checking and Aceeptance of Hydroeletirc Projects
Appendix 9: Measures for Administration of Small Hydropower Replacing Firewood Project
Appendix 10: Management Approach of Construction of New Rural Hydropower Electrification Project

圖表目錄
圖表目錄請(qǐng)咨詢客服
本報(bào)告目錄與內(nèi)容系中投顧問(wèn)原創(chuàng),未經(jīng)中投顧問(wèn)書(shū)面許可及授權(quán),拒絕任何形式的復(fù)制、轉(zhuǎn)載,謝謝!

如果報(bào)告內(nèi)容未能滿足您的需求,請(qǐng)了解我們的報(bào)告定制服務(wù)>>

Investment & Forecast Report on China Hydropower Industry, the Year of 2024-2028

    中投影響力

    資質(zhì)榮譽(yù) 媒體合作 公司動(dòng)態(tài)

    外商投資企業(yè)協(xié)會(huì)會(huì)員單位外商投資企業(yè)協(xié)會(huì)會(huì)員單位

    最具品牌價(jià)值行業(yè)門(mén)戶最具品牌價(jià)值行業(yè)門(mén)戶

    發(fā)改委十佳創(chuàng)新案例金典獎(jiǎng)發(fā)改委十佳創(chuàng)新案例金典獎(jiǎng)

    電子行業(yè)協(xié)會(huì)副會(huì)長(zhǎng)單位電子行業(yè)協(xié)會(huì)副會(huì)長(zhǎng)單位

    哈爾濱最佳項(xiàng)目策劃智庫(kù)單位哈爾濱最佳項(xiàng)目策劃智庫(kù)單位

    深圳市商業(yè)聯(lián)合會(huì)會(huì)員單位深圳市商業(yè)聯(lián)合會(huì)會(huì)員單位

    珠海招商合伙人珠海招商合伙人

    重慶市產(chǎn)業(yè)招商聯(lián)盟單位重慶市產(chǎn)業(yè)招商聯(lián)盟單位

    中投顧問(wèn)協(xié)辦的濟(jì)陽(yáng)區(qū)(深圳) "新能源汽車(chē)產(chǎn)業(yè)"專(zhuān)題推介會(huì)中投顧問(wèn)協(xié)辦的濟(jì)陽(yáng)區(qū)(深圳) "新能源汽車(chē)產(chǎn)業(yè)"專(zhuān)題推介會(huì)

    中投顧問(wèn)受邀為合肥市投促部門(mén)作機(jī)器人產(chǎn)業(yè)招商培訓(xùn)中投顧問(wèn)受邀為合肥市投促部門(mén)作機(jī)器人產(chǎn)業(yè)招商培訓(xùn)

    中投顧問(wèn)為珠海全市招商系統(tǒng)培訓(xùn)產(chǎn)業(yè)招商大腦獲得圓滿成功中投顧問(wèn)為珠海全市招商系統(tǒng)培訓(xùn)產(chǎn)業(yè)招商大腦獲得圓滿成功

    中投顧問(wèn)為漢中市作"大數(shù)據(jù)招商、精準(zhǔn)招商"培訓(xùn)中投顧問(wèn)為漢中市作"大數(shù)據(jù)招商、精準(zhǔn)招商"培訓(xùn)

    中投顧問(wèn)項(xiàng)目組赴安慶迎江經(jīng)開(kāi)區(qū)調(diào)研中投顧問(wèn)項(xiàng)目組赴安慶迎江經(jīng)開(kāi)區(qū)調(diào)研

    湖州市吳興區(qū)駐深辦來(lái)訪中投顧問(wèn)湖州市吳興區(qū)駐深辦來(lái)訪中投顧問(wèn)

    河北邢臺(tái)南宮市駐深領(lǐng)導(dǎo)赴中投顧問(wèn)拜訪河北邢臺(tái)南宮市駐深領(lǐng)導(dǎo)赴中投顧問(wèn)拜訪

    中投顧問(wèn)陪同廣州某經(jīng)開(kāi)區(qū)領(lǐng)導(dǎo)赴外商協(xié)會(huì)治談合作中投顧問(wèn)陪同廣州某經(jīng)開(kāi)區(qū)領(lǐng)導(dǎo)赴外商協(xié)會(huì)治談合作

    微信掃一掃關(guān)注公眾號(hào)"中投顧問(wèn)"(ID :touziocn),回復(fù)""即可獲取。

    知道了
    QQ咨詢
    在線客服