首次出版:最新修訂:November 2013交付方式:特快專(zhuān)遞(2-3天送達(dá))
報(bào)告屬性:共0頁(yè)下載目錄 版權(quán)聲明
定購(gòu)電話:0755-82571522、82571566、400-008-1522
24小時(shí)服務(wù)熱線:138 0270 8576 定制報(bào)告
版本 | 在線版 | 電子版+印刷版 | 在線報(bào)告庫(kù)(超1000份報(bào)告)全庫(kù) |
---|---|---|---|
優(yōu)惠價(jià) | RMB 6800 | RMB 7800 | RMB 9800 |
原價(jià) | RMB 9600 | RMB 9800 | - |
在線報(bào)告庫(kù)有超1000份報(bào)告,
全庫(kù)只需9800元,平均每份報(bào)告僅需9.8元!
聯(lián)系電話: 400 008 0586; 0755-82571568
微信掃碼:
CHAPTER 1 RELATED OVERVIEW OF THE HYDROPOWER INDUSTRY
1.1 Definition of hydropower industry
1.1.1 Definition of hydropower
1.1.2 Characteristics of hydropower
1.1.3 Classification of hydropower station
1.2 The concept and definition of small hydropower
1.2.1 Meaning and resources of small hydropower
1.2.2 Classification of small hydropower
1.2.3 The characteristics and advantages of small hydropower
1.3 Introduction of Chinese hydropower resources
1.3.1 Chinese reserves of hydropower resources
1.3.2 Characteristics of Chinese hydropower resources
1.3.3 Status of hydropower resources in China’s energy system
CHAPTER 2 ANALYSIS OF DEVELOPMENT OF INTERNATIONAL HYDROPOWER INDUSTRY DEVELOPMENT FROM 2011 TO 2013
2.1 Development overview of the global hydropower industry from 2011 to 2013
2.1.1 Sustainable development of the world requires hydropower development
2.1.2 Development review of the global hydropower industry in 2010
2.1.3 Global hydropower increases from 2011 to 2012
2.1.4 Analysis of global water consumption in 2012
2.2 Analysis of hydropower development in Europe
2.2.1 Development review of European hydropower market
2.2.2 Hydroelectric project has achieved growth in the UK
2.2.3 French hydroelectric capacity status
2.2.4 Austrian hydropower development plan
2.2.5 Development and prospects of hydropower resources in Russia
2.3 Hydropower development in Asian countries
2.3.1 The Japanese government has formulated policy to promote the development of hydropower construction
2.3.2 Overview of the hydropower industry in Pakistan
2.3.3 Armenia small hydropower industry is flourishing
2.3.4 Myanmar vigorously develops hydropower to solve the power shortage
2.4 Analysis of hydropower development in other regions
2.4.1 Uganda will increase investment in hydropower projects
2.4.2 The African Union will actively promote the development of hydropower projects
2.4.3 Development status of Chilean hydropower
2.4.4 South American Itaipu hydropower station had highest generating capacity in the world in 2012
2.4.5 Canadian hydropower project investment status in future
2.4.6 The world’s largest hydropower project will launch in 2015
CHAPTER 3 OVERVIEW OF HYDROPOWER RESOURCES OF CHINA’S MAJOR RIVERS
3.1 The Yangtze River
3.1.1 General overview
3.1.2 Hydropower resources
3.1.3 Types of tributaries
3.1.4 The Jinsha River
3.1.5 The Yalong River
3.1.6 The Tuo River
3.1.7 The Min River
3.1.8 The Jialing River
3.1.9 The Wu River
3.1.10 The Yuan River
3.1.11 The Xiang River
3.1.12 The Han River
3.1.13 The Gan River
3.2 The Yellow River
3.2.1 Overview of the Yellow River
3.2.2 Yellow River tributary
3.2.3 Yellow River upstream hydropower development status
3.2.4 Yellow River upstream hydropower planning
3.2.5 Hydropower planning in middle of Yellow River
3.2.6 Suggestions
3.3 The Pearl River
3.3.1 General overview
3.3.2 Hydropower development status
3.3.3 Pearl River tributaries
3.3.4 Development planning
3.4 Rivers in the border of Southwest China
3.4.1 The Yarlung Zangbo River
3.4.2 The Nu River
3.4.3 Lantsang River
CHAPTER 4 COMPREHENSIVE ANALYSIS OF CHINESE HYDROPOWER INDUSTRY FROM 2011 TO 2013
4.1 Overview of China’s hydropower industry
4.1.1 The significance of China to develop hydropower
4.1.2 The course of development of hydropower
4.1.3 The total installed capacity of hydropower in China ranked first in the world
4.1.4 China’s hydropower has made great economic and social contribution
4.2 Analysis of development of China’s hydropower industry from 2011 to 2013
4.2.1 Analysis of the hotpot of China’s hydropower industry in 2011
4.2.2 China’s hydropower development and construction status in 2012
4.2.3 Overview of China’s hydropower consumption in 2012
4.2.4 Analysis of the hotpot of China’s hydropower industry in 2012
4.2.5 Overview of hydropower industry development from January to May 2013
4.3 Analysis of Chinese hydroelectric yields from 2010 to 2012
4.3.1 Analysis of hydropower yield of national and major provinces from January to December 2010
4.3.2 Analysis of hydropower yield of national and major provinces from January to December 2011
4.3.3 Analysis of hydropower yield of national and major provinces from January to December 2012
4.4 Analysis of hydropower development situation from 2011 to 2013
4.4.1China promulgated policies to strengthen management of hydropower construction in 2011
4.4.2 China implemented the new hydropower development regulations in 2011
4.4.3 Ministry of Environmental Protection issued a notice to regulate hydropower development in early 2012
4.4.4 Ministry of Environmental Protection clear guidelines for hydropower development in 2012
4.4.5 In 2013, China proposed to actively develop hydropower
4.4.6 In 2013, the Ministry of Water Resources proposed to strengthen the construction of rural hydropower
4.5 Construction status of key hydropower projects from 2011 to 2013
4.5.1 In 2011, the Dadu River Houziyan Hydropower Station started construction
4.5.2 In 2012, the largest hydropower station in Sichuan Tibetan area put into operation
4.5.3 In 2012, the Three Gorges Hydropower Station units all entered commercial operation
4.5.4 In 2012, the first batch of units of Xiangjiaba Hydropower Station officially generated electricity
4.5.5 In 2013, Xinjiang Kushi Tayi Hydropower Station went into full production
4.5.6 In 2013, Yalong River Guandi Hydropower Station entered commercial operation
4.5.7 In 2013, Jinsha River Xiluodu Hydropower Station put into operation
4.6 Analysis of China’s small hydropower development from 2011 to 2013
4.6.1 Small hydropower’ s position in the national economy
4.6.2 Overview of construction and development status of small hydropower in China
4.6.3 China’s small hydropower construction has ushered in development opportunities
4.6.4 China promotes construction of small hydropower generation fuel project
4.7 Analysis of river basin hydropower development
4.7.1 Analysis of river basin hydropower development principles
4.7.2 River basin hydropower development and management experience
4.7.3 River basin hydropower comprehensive development mode
4.7.4 Hydropower cascade development of river basin should be innovated
4.7.5 The overall development of single mian basin is conducive to the basin hydropower development
4.8 The problems in the development of China’s hydropower industry
4.8.1 China’s hydropower development deficiencies
4.8.2 The main problem of China’s hydropower industry
4.8.3 The constraints of China’s hydropower development should be solved
4.9 Analysis of development strategy of China’s hydropower industry
4.9.1 The fast and effective development methods of China’s hydropower industry
4.9.2 Using sustainable development concept to promote the scientific development of China’s hydropower
4.9.3 China’s hydropower industry international development strategy
4.9.4 New institutional mechanisms promotes sustainable development of hydropower
CHAPTER 5 ANALYSIS OF FINANCIAL SITUATION OF HYDROPOWER INDUSTRY IN CHINA
5.1 Economic scale of hydropower industry in China
5.1.1Sales revenue of hydropower industry in China between 2008 and 2012
5.1.2 Total profit of hydropower industry in China between 2008 and 2012
5.1.3 Total assets of hydropower industry in China between 2008 and 2012
5.2 Profitability of hydropower industry in China
5.2.1 Loss suffering ratio of hydropower industry in China between 2008 and 2012
5.2.2 Gross margin of hydropower industry in China between 2008 and 2012
5.2.3 Cost-profit ratio of hydropower industry in China between 2008 and 2012
5.2.4 Sales-profit ratio of hydropower industry in China between 2008 and 2012
5.3 Operating capacity of hydropower industry in China
5.3.1 Receivables turnover ratio of hydropower industry in China between 2008 and 2012
5.3.2 Current assets turnover ratio of hydropower industry in China between 2008 and 2012
5.3.3 Total asset turnover ratio of hydropower industry in China between 2008 and 2012
5.4 Solvency of hydropower industry in China
5.4.1 Assets-liability ratio of hydropower industry in China between 2008 and 2012
5.4.2 Interest cover of hydropower industry in China between 2008 and 2012
5.5 Comprehensive appraisal of the financial status of the hydropower industry in China
5.5.1 Comprehensive appraisal of the financial status of the hydropower industry in China
5.5.2 Analysis of the economic factors affecting the financial status of hydropower industry in China
CHAPTER 6 ANALYSIS OF DEVELOPMENT OF RURAL HYDROPOWER ELECTRIFICATION IN CHINA FROM 2011 TO 2013
6.1 Overview of China’s rural hydropower electrification development from 2011 to 2013
6.1.1 Construction background of China’s rural hydropower electrification
6.1.2 Review of construction achievements of China’s rural hydropower electrification
6.1.3 Development of China’s rural hydropower electrification in 2011
6.1.4 Development of China’s rural hydropower electrification in 2012
6.1.5 In 2012, China regulated rural hydropower electrification project management
6.1.6 Future development of China’s new rural hydropower electrification
6.2 Layout planning and construction scale of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
6.2.1 Layout planning
6.2.2 The scope of planning
6.2.3 Principles for determining the project
6.2.4 Construction scale
6.3 Regional planning of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
6.3.1 Planning of the Southwest area
6.3.2 Planning of the Northwest area
6.3.3 Planning of the Northeast area
6.3.4 Planning of the Central area
6.3.5 Planning of the Southeast coastal area
6.4 Planning of management system and operation mechanism of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
6.4.1 Management system
6.4.2 Operation mechanism
6.4.3 State-owned assets management
6.5 Investment estimation and benefit analysis of new rural hydropower electrification during the “Twelfth Five-Year Planning” period
6.5.1 Investment estimation
6.5.2 Financing
6.5.3 Benefit analysis
6.6 Problems in and solutions of the development of China’s rural hydropower electrification
6.6.1 The main problems in the construction of China’s rural hydropower electrification
6.6.2 The main countermeasures in the construction of China’s rural hydropower electrification
6.6.3 The impact of China rural hydropower electrification development on the environment and its countermeasures
6.6.4 Safeguards of China rural hydropower electrification development
CHAPTER 7 DEVELOPMENT OF HYDROPOWER INDUSTRY IN MAJOR REGIONS OF CHINA FROM 2011 TO 2013
7.1 Sichuan
7.1.1 Sichuan hydropower industry development status in 2012
7.1.2 Development goals of Sichuan hydropower industry in 2013
7.1.3 Sichuan Aba Prefecture continues to accelerate hydropower development during the “Twelfth Five-Year Planning” period
7.1.4 Mianyang hydropower project investment planning during the “Twelfth Five-Year Planning” period
7.1.5 Future development proposals in Sichuan hydropower industry
7.2 Yunnan
7.2.1 Immigration and investment status of major hydropower projects in Yunnan in 2011
7.2.2 Yunnan hydropower construction maintained stable development in 2012
7.2.3 Yunnan Province introduced new policy to develop small hydropower in 2012
7.2.4 Yunnan rural hydropower expansion and transformation plan has been approved in 2013
7.2.5 Prospects of Yunnan new rural hydropower electrification during the “Twelfth Five-Year Planning” period
7.3 Guizhou
7.3.1 Small hydropower development in Guizhou Province in 2011
7.3.2 Overview of hydropower construction in Guizhou Province in 2012
7.3.3 Measures for Guizhou rural hydropower industry to accelerate the development
7.3.4 Guizhou new rural hydropower installed target during the “Twelfth Five-Year Planning” period
7.4 Other provinces
7.4.1 Anhui
7.4.2 Guangdong
7.4.3 Guangxi
7.4.4 Jiangxi
7.4.5 Heilongjiang
7.4.6 Zhejiang
7.4.7 Chongqing
7.4.8 Fujian
7.4.9 Hebei
7.4.10 Shaanxi
CHAPTER 8 ANALYSIS ON MANAGEMENT OF CHINA’S HYDROPOWER DEVELOPMENT AND CONSTRUCTION FROM 2011 TO 2013
8.1 Analysis on the management of hydropower exploration project
8.1.1 The nature of enterprise project management
8.1.2 Management mode of hydropower exploration and design project
8.1.3 Three phases of management of hydropower exploration and design project
8.1.4 Development ideas of management of hydropower exploration and design project
8.2 Analysis of the quality management of hydropower projects
8.2.1 Current situation of China’s hydropower project quality management
8.2.2 Problems in quality management of hydropower engineering
8.2.3 Recommendations to strengthen the hydropower project quality management
8.3 Hydropower project resettlement policy
8.3.1 Hydropower project resettlement content
8.3.2 Problems in the land acquisition and resettlement of Chinese hydropower project
8.3.3 Theoretical framework of the design and innovation of China’s hydropower project resettlement institution
8.3.4 Specific recommendations of the design and innovation of China’s hydropower project resettlement institution
8.4 Analysis of safety supervision of hydropower development enterprise
8.4.1 Background of safety supervision of hydropower development enterprise
8.4.2 Problems in safety supervision of China’s hydropower construction projects
8.4.3 China’s countermeasures to strengthen safety supervision over hydropower construction project owners
CHAPTER 9 RESEARCH ON HYDROPOWER TECHNOLOGY FROM 2011 TO 2013
9.1 Technical analysis of hydropower units
9.1.1 Analysis of capacity-plus transformation technology for hydropower generator
hydroelectric turbine generator set Rehabilitation Technical Analysis
9.1.2 Analysis of hydraulic turbine composite antiwear plate and pump composite antiwear seal rings technology
9.1.3 Technical analysis of hydroelectric generating excitation device
9.1.4 The cavitation erosion-resistant protective technology of metallic materials for turbine and pump
9.1.5 The cavitation erosion-resistant protective technology of non-metallic materials for turbine and pump
9.1.6 Technical analysis of micro hydro generating units (including load regulator)
9.1.7 Analysis of overspeed protection technology of rural hydropower station
9.2 Analysis of small hydropower technology
9.2.1 Analysis of renovation technology of small hydropower station
9.2.2 Analysis of runoff calculation technology of small hydropower projects
9.2.3 Analysis of free-pressure tunnel water diversion technology of small hydropower station
9.2.4 Small hydropower station technology transformation needs to be strengthened
9.2.5 New technology development trends of small hydropower equipment
9.3 Small hydropower station computer monitoring technology systems
9.3.1 The implementation status of computer monitoring system in small hydropower station
9.3.2 The implementation problems of computer monitoring system in small hydropower station
9.3.3 Operating personnel is lack of technical force
9.4 Analysis of China’s rural hydropower automation
9.4.1 Review of the rural hydropower automation development
9.4.2 Analysis of rural hydropower automation status
9.4.3 Analysis of rural hydropower station computer monitoring system structure and main equipment selection
9.4.4 Hydropower automation transformation case study (Hubei Weijiazhou Hydropower Station)
9.4.5 Hydropower automation transformation case study (Hunan Yushi Hydropower Station)
9.4.6 Development strategy for China’s rural hydropower station automation
CHAPTER 10 ANALYSIS OF DEVELOPMENT OF HYDROPOWER EQUIPMENT INDUSTRY FROM 2011 TO 2013
10.1 Overview of development of hydropower equipment industry from 2011 to 2013
10.1.1 China’s hydropower equipment significantly increased the domestic level
10.1.2 Development status of China’s hydropower equipment industry
10.1.3 Hydropower equipment utilization time status from January to May, 2013
10.1.4 Development of hydropower equipment market in good momentum
10.1.5 Large hydropower equipment manufacturing industry achieved breakthrough
10.2 Analysis of small hydropower equipment market from 2011 to 2013
10.2.1 Overview of China’s small hydropower equipment market
10.2.2 Opportunities and challenges of China’s small hydropower equipment industry coexist
10.2.3 Development situation of China’s small hydropower equipment market is grim
10.2.4 Development strategies of small hydropower equipment manufacturing enterprises
10.3 Analysis of yields of China’s hydroelectric generating set from 2010 to 2012
10.3.1 Analysis of yields of hydroelectric generating set in the whole country and major provinces from January to December 2010
10.3.2 Analysis of yields of hydroelectric generating set in the whole country and major provinces from January to December 2011
10.3.3 Analysis of yields of hydroelectric generating set in the whole country and major provinces from January to December 2012
10.4 Challenges and countermeasures of hydropower equipment industry
10.4.1 Problems in Chinese hydropower equipment industry
10.4.2 Risks and impacts of China’s hydropower equipment industry
10.4.3 Development proposals of Chinese hydropower equipment industry
10.4.4 Innovation is the most important for hydropower equipment manufacturing enterprises
10.5 Outlook of China’s hydropower equipment industry
10.5.1 Chinese hydropower equipment market has a broad future
10.5.2 Chinese hydropower equipment will usher in the great leap forward development
10.5.3 The development focus of China’s hydropower equipment industry in the future
CHAPTER 11 ANALYSIS OF INVESTMENT AND FINANCING OF HYDROPOWER INDUSTRY
11.1 Investment and financing opportunities and risks of Chinese hydropower industry
11.1.1 China encourages and supports private capital investment in electricity
11.1.2 China’s hydropower development and construction are facing new opportunities
11.1.3 China’s financial support for rural hydropower reform in 2013
11.1.4 In 2013, financial institutions supported the construction of small hydropower
11.1.5 Investment opportunities exist in hydropower equipment field
11.1.6 Financing prospects of China’s hydropower construction
11.1.7 Investment risks of hydropower industry
11.2 Analysis of China’s hydropower BOT Financing
11.2.1 Overview of BOT financing
11.2.2 Feasibility analysis of China’s hydropower using BOT financing
11.2.3 Advantage of BOT financing in hydropower project
11.2.4 Problems of using BOT financing in hydropower development
11.3 Major issues of investment and financing of Chinese hydropower industry to be addressed
11.3.1 Relationship between hydropower development and environmental protection
11.3.2 Investment benefit protection of hydropower enterprises
11.3.3 The establishment of relatively open hydropower investment market
11.3.4 Selection of hydropower investment and development mode
11.3.5 The establishment of an effectively competitive hydropower development model
11.3.6 Optimal combination of hydro financing structure
11.3.7 The balance between the interests of hydropower investment
11.4 Investment and development countermeasures of China’s hydropower industry
11.4.1 Establishment of lively hydropower investment management system
11.4.2 Introduction of strategic investors to ease capital shortage
11.4.3 focus on the guarantee of hydropower intensive development
11.4.4 adjustment and optimization of the debt structure of construction funds
11.4.5 further broaden the financing methods and channels
11.4.6 Establish the mechanism for guidance and inspirtion of hydropower investment expansion
11.4.7 Formation of “multi-lifted” investment allocation and cooperation mechanisms
11.4.8 Investment in hydropower development should be shifted to the Tibetan Plateau
CHAPTER 12 PROSPECTS AND DEVELOPMENT TRENDS OF HYDROPOWER INDUSTRY
12.1 Prospect of hydropower industry
12.1.1 China’s hydropower development has a broad space for development
12.1.2 China’s hydropower industry will continue sustained and rapid development
12.1.3 Prospects of China’s rural hydropower in the future
12.1.4 Hydropower development in western China will enter a new phase
12.2 The “Twelfth Five-Year Planning” of hydropower development
12.2.1 Development situation
12.2.2 Guidelines and objectives
12.2.3 Key tasks
12.2.4 Planning and implementation
12.2.5 Analysis of Investment estimation and social environment influence
12.3 CIConsulting’s prediction of the development of Chinese hydropower industry from 2013 to 2017
12.3.1 Analysis of the factors affecting the development of hydropower industry
12.3.2 CIConsulting’s prediction of the revenue of Chinese hydropower industry from 2013 to 2017
12.3.3 CIConsulting’s prediction of the profit of Chinese hydropower industry from 2013 to 2017
12.3.4 CIConsulting’s prediction of the output value of Chinese hydropower industry from 2013 to 2017
12.3.5 CIConsulting’s prediction of the yield of Chinese hydropower industry from 2013 to 2017
12.3.6 CIConsulting’s prediction of total installed capacity of China’s hydropower from 2013 to 2017
CHAPTER 13 OPERATING ANALYSIS OF KEY HYDROPOWER ENTERPRISES
13.1 China Yangtze Power Co., Ltd.
13.1.1 Development condition between 2006 and 2012
13.1.2 Overall size and profitability
13.1.3 Analysis of solvency
13.1.4 Analysis of operating capacity
13.1.5 Analysis of profitability
13.1.6 Analysis of growth capacity
13.2 Huanghe Hydropower Development Co. Ltd.
13.2.1 Development condition between 2006 and 2012
13.2.2 Overall size and profitability
13.2.3 Analysis of solvency
13.2.4 Analysis of operating capacity
13.2.5 Analysis of profitability
13.2.6 Analysis of growth capacity
13.3 Longtan Hydropower Development Co. Ltd.
13.3.1 Development condition between 2006 and 2012
13.3.2 Overall size and profitability
13.3.3 Analysis of solvency
13.3.4 Analysis of operating capacity
13.3.5 Analysis of profitability
13.3.6 Analysis of growth capacity
13.4 Guizhou Wujiang Hydropower Development Co., Ltd.
13.4.1 Development condition between 2006 and 2012
13.4.2 Overall size and profitability
13.4.3 Analysis of solvency
13.4.4 Analysis of operating capacity
13.4.5 Analysis of profitability
13.4.6 Analysis of growth capacity
13.5 Wuling Power Co., Ltd.
13.5.1 Development condition between 2006 and 2012
13.5.2 Overall size and profitability
13.5.3 Analysis of solvency
13.5.4 Analysis of operating capacity
13.5.5 Analysis of profitability
13.5.6 Analysis of growth capacity
13.6 Yalong River Hydropower Development Co., Ltd.
13.6.1 Development condition between 2006 and 2012
13.6.2 Overall size and profitability
13.6.3 Analysis of solvency
13.6.4 Analysis of operating capacity
13.6.5 Analysis of profitability
13.6.6 Analysis of growth capacity
13.7 Huaneng Lancang River Hydropower Co., Ltd. (Guandu Region)
13.7.1 Development condition between 2006 and 2012
13.7.2 Overall size and profitability
13.7.3 Analysis of solvency
13.7.4 Analysis of operating capacity
13.7.5 Analysis of profitability
13.7.6 Analysis of growth capacity
13.8 Hubei Qingjiang Hydropower Development Co., Ltd.
13.8.1 Development condition between 2006 and 2012
13.8.2 Overall size and profitability
13.8.3 Analysis of solvency
13.8.4 Analysis of operating capacity
13.8.5 Analysis of profitability
13.8.6 Analysis of growth capacity
13.9 East China Tianhuangping Pumped Storage Power Co., Ltd.
13.9.1 Development condition between 2006 and 2012
13.9.2 Overall size and profitability
13.9.3 Analysis of solvency
13.9.4 Analysis of operating capacity
13.9.5 Analysis of profitability
13.9.6 Analysis of growth capacity
13.10 Sichuan Baozhusi Hydropower Plant of China Huadian Gorporation
13.10.1 Development condition between 2006 and 2012
13.10.2 Overall size and profitability
13.10.3 Analysis of solvency
13.10.4 Analysis of operating capacity
13.10.5 Analysis of profitability
13.10.6 Analysis of growth capacity
13.11 Huanghe Hydropower Development Co., Ltd. (Xiaolangdi Construction Bureau)
13.11.1 Development condition between 2006 and 2012
13.11.2 Overall size and profitability
13.11.3 Analysis of solvency
13.11.4 Analysis of operating capacity
13.11.5 Analysis of profitability
13.11.6 Analysis of growth capacity
13.12 Guodian Daduhe Company Jizui Hydropower Generation Plant
13.12.1 Development condition between 2006 and 2012
13.12.2 Overall size and profitability
13.12.3 Analysis of solvency
13.12.4 Analysis of operating capacity
13.12.5 Analysis of profitability
13.12.6 Analysis of growth capacity
13.13 Fujian Shuikou Power Generation Group Co., Ltd.
13.13.1 Development condition between 2006 and 2012
13.13.2 Overall size and profitability
13.13.3 Analysis of solvency
13.13.4 Analysis of operating capacity
13.13.5 Analysis of profitability
13.13.6 Analysis of growth capacity
13.14Guotou Yunnan Dachaoshan Hydropower Company Limited (Wuhua Region)
13.14.1 Development condition between 2006 and 2012
13.14.2 Overall size and profitability
13.14.3 Analysis of solvency
13.14.4 Analysis of operating capacity
13.14.5 Analysis of profitability
13.14.6 Analysis of growth capacity
13.15 Hubei Qingjiang Hydropower Development Co., Ltd. (Shuibuya)
13.15.1 Development condition between 2006 and 2012
13.15.2 Overall size and profitability
13.15.3 Analysis of solvency
13.15.4 Analysis of operating capacity
13.15.5 Analysis of profitability
13.15.6 Analysis of growth capacity
13.16 Guizhou Qianyuan Power Co., Ltd.
13.16.1 Development condition between 2006 and 2012
13.16.2 Overall size and profitability
13.16.3 Analysis of solvency
13.16.4 Analysis of operating capacity
13.16.5 Analysis of profitability
13.16.6 Analysis of growth capacity
13.17 Datang Yantan Hydropower Co., Ltd.
13.17.1 Development condition between 2006 and 2012
13.17.2 Overall size and profitability
13.17.3 Analysis of solvency
13.17.4 Analysis of operating capacity
13.17.5 Analysis of profitability
13.17.6 Analysis of growth capacity
13.18 Hanjiang hydropower (Group) Co., Ltd.
13.18.1 Development condition between 2006 and 2012
13.18.2 Overall size and profitability
13.18.3 Analysis of solvency
13.18.4 Analysis of operating capacity
13.18.5 Analysis of profitability
13.18.6 Analysis of growth capacity
13.19 Tianshengqiao-ⅠHydro-Power Development Co., Ltd.
13.19.1 Development condition between 2006 and 2012
13.19.2 Overall size and profitability
13.19.3 Analysis of solvency
13.19.4 Analysis of operating capacity
13.19.5 Analysis of profitability
13.19.6 Analysis of growth capacity
13.20 Sichuan Huaneng Baoxing Power Co., Ltd.
13.20.1 Development condition between 2006 and 2012
13.20.2 Overall size and profitability
13.20.3 Analysis of solvency
13.20.4 Analysis of operating capacity
13.20.5 Analysis of profitability
13.20.6 Analysis of growth capacity
APPENDIX
Appendix 1: Water Law of People’s Republic of China
Appendix 2: Electricity Law of People’s Republic of China
Appendix 3: Interim Measures for Water Storage Safety Appraisal of Hydropower Construction Project
Appendix 4: Provisional Regulations on Procedures Management of Water Conservancy Project Construction
Appendix 5: Measures for Price Administration of Water Supply of Water Engineering
Appendix 6: Regulations of dam operating safety management of hydropower station
Appendix 7: Hydropower Project Budget Estimate Adjustments Management Approach (for Trial Implementation)
Appendix 8: Administration Approach of Checking and Aceeptance of Hydroeletirc Projects
Appendix 9: Measures for Administration of Small Hydropower Replacing Firewood Project
Appendix 10: Management Approach of Construction of New Rural Hydropower Electrification Project