CHAPTER 1 DEVELOPMENT POTENTIAL OF NATUAL GAS POWER GENERATION INDUSTRY IN CHINA
1.1 The Definition of natural gas power generation
1.1.1 The concept of natural gas power generation
1.1.2 The modes of natural gas power generation
1.1.3 The characteristics of natural gas power generation
1.2 Necessity of natural gas power generation
1.2.1 Conducive to alleviate environmental pressure
1.2.2 Conducive to optimize the energy structure
1.2.3 Conducive to the safe operation of power grid
1.2.4 Conducive to the development of the natural gas industry
1.3 Analysis of competitiveness of substitutes
1.3.1 Thermal power
1.3.2 Hydropower
1.3.3 Wind power
1.3.4 Photovoltaic power
1.3.5 Nuclear power
CHAPTER 2 ANALYSIS OF POLICY ENVIRONMENT OF NATUAL GAS INDUSTRY IN CHIA FROM 2011 TO 2013
2.1 Gas exploration and development policy
2.1.1China’s attempt to give conventional oil and gas exploration rights through competition
2.1.2 Subsidy policy of shale gas mining was introduced in 2012
2.1.3 “Twelfth Five-Year” planning of natural gas development was announced in 2012
2.2 The comprehensive utilization policies of natural gas
2.2.1 “Natural Gas Utilization Policy” (2012 Edition)
2.2.2 Interpretation of the new version of “Natural Gas Utilization Policy”
2.2.3 Policy support the development of natural gas distributed energy
2.2.4 “Twelfth Five-Year” planning of town gas was released in 2012
2.3 Analysis of regulatory policy orientation of energy structure
2.3.1 Full implementation of oil and gas resources tax reform in China
2.3.2 Government specifications for the collections and uses of renewable energy development fund
2.3.3 “Catalogue for the Guidance of Industrial Structure Adjustment” guides energy development
2.3.4 Opinions on Grid Integration Services of Distributed Power was published in 2013
2.3.5 “Twelfth Five-Year” planning of Energy Development” encourages natural gas power generation
2.4 Interpretation of other relevant policies
2.4.1 Electricity pricing mechanism
2.4.2 Electricity environmental protection policy
2.4.3 Energy conservation policy
2.4.4 Investment and financing policies of energy sector
CHAPTER 3 OVERALL ANALYSIS OF NATURAL GAS POWER GENERATION INDUSTRY IN CHINA FROM 2011 TO 2013
3.1 Experience of foreign natural gas power generation industry
3.1.1 General situation
3.1.2 Regional development
3.1.3 Experience and inspiration
3.2 Summary of development of Chinese natural gas power generation industry
3.2.1 Development stage
3.2.2 Growth of demand
3.2.3 Development status
3.2.4 Distribution of production capacity
3.2.5 Market structure
3.3 Analysis of China’s centralized natural gas power generation industry
3.3.1 Development advantages of centralized natural gas power generation
3.3.2 Analysis of the position of centralized natural gas power generation
3.3.3 Market structure of China’s centralized natural gas power generation industry
3.3.4 Planning objectives of China’s centralized natural gas power generation
3.4 Analysis of China’s distributed natural gas power generation industry
3.4.1 Value assessment of distributed natural gas power generation projects
3.4.2 China’s natural gas distributed generation ushers in development opportunities
3.4.3 Analysis of distributed natural gas power generation equipment market
3.4.4 Restricting factor of the development of distributed natural gas power generation
3.4.5 Future development ideas of distributed natural gas power generation
3.5 Challenges of Chinese natural gas power generation industry
3.5.1 Uncompetitive electricity price
3.5.2 Safe and stable supply of natural gas
3.5.3 Difficulties of power generation and grid integration of distributed natural gas
3.5.4 Gas turbine manufacturing core technologies have shortages
3.6 Recommendations on development of Chinese natural gas power generation industry
3.6.1 Strengthen scientific and unified planning
3.6.2 The implementation of classified gas price
3.6.3 Clear electricity pricing mechanism
3.6.4 Improve flexibility of power supply
3.6.5 Form an integrated business model
3.6.6 Improve the autonomy level of gas turbine
CHAPTER 4 ANALYSIS OF REGIONAL DEVELOPMENT OF NATURAL GAS POWER GENERATION INDUSTRY IN CHINA FROM 2011 TO 2013
4.1 North China
4.1.1 Beijing
4.1.2 Tianjin
4.1.3 Hebei
4.1.4 Shanxi
4.1.5 Shandong
4.2 East China
4.2.1 Shanghai
4.2.2 Jiangsu
4.2.3 Zhejiang
4.2.4 Anhui
4.3 Central China
4.3.1 Shaanxi
4.3.2 Henan
4.3.3 Hubei
4.3.4 Hunan
4.3.5 Jiangxi
4.4 South China
4.4.1 Fujian
4.4.2 Guangdong
4.4.3 Guangxi
4.4.4 Hainan
4.4.5 Sichuan
CHAPTER 5 ANALYSIS OF ECONOMIC BENEFIT OF NATURAL GAS POWER GENERATION PROJECTS
5.1 Calculation model of power generation cost of natural gas power stations
5.1.1 The total investment costs
5.1.2 Depreciation costs
5.1.3 Fuel costs
5.2 Sensitivity analysis of the benefits of natural gas
5.2.1 Calculation model of grid-connected electricity price of natural gas power plants
5.2.2 Sensitivity analysis of the grid-connected electricity price for natural gas price
5.2.3 Sensitivity analysis of the grid-connected electricity price for annual utilization hours
5.2.4 Influence of annual average thermal efficiency of natural gas power plant
5.3 Economic analysis of natural gas power plant
5.3.1 Economic comparison of natural gas and coal power generation
5.3.2 Peak-shaving natural gas power plant begun economy
5.3.3 High gas prices influence economy of natural gas power generation
5.3.4 Government subsidies protect economy of natural gas power generation projects
5.4 Analysis of electricity price settlement of natural gas power generation projects
5.4.1 Operation mode of domestic natural gas power generation projects
5.4.2 Electricity price formation mechanism of natural gas power generation projects
5.4.3 Analysis of electricity price calculation of natural gas power generation projects
CHAPTER 6 ANALYSES OF GRID INTEGRATION MODE AND EFFECT OF NATURAL GAS POWER GENERATION PROJECTS
6.1 Characteristics of grid integration of natural gas distributed energy
6.1.1 Small access capacity
6.1.2 Low voltage level of access
6.1.3 Scattered access locations
6.2 Analysis of grid integration pattern of natural gas distributed energy
6.2.1 Operate independently
6.2.2 Grid-connected but not on the grid
6.2.3 Residual power on the grid
6.2.4 All electricity on the grid
6.3 Analysis of the impact of grid integration of natural gas power generation projects on the power grid network
6.3.1 The impact on the short-circuit current and countermeasures
6.3.2 The impact on the relay protection and countermeasures
6.3.3 The impact on power quality and countermeasures
6.3.4 The impact on distribution network regulator and countermeasures
6.3.5 The impact on voltage stability and countermeasures
6.3.6 The impact on power grid planning and countermeasures
6.3.7 The impact on reliability of power supply and countermeasures
6.4 Analysis of the impact of grid integration of natural gas power generation projects on scheduling management
6.4.1 The main impact
6.4.2 Countermeasures
6.5 Analysis of the impact of grid integration of natural gas power generation projects on power measurement
6.5.1 The main impact
6.5.2 Countermeasures
CHAPTER 7 ANALYSIS OF NATURAL GAS SUPPLY OF THE UPSTREAM OF CHINA’S NATURAL GAS POWER GENERATION INDUSTRY CHAIN FROM 2011 TO 2013
7.1 Summary of China’s natural gas industry
7.1.1 Natural gas resources and distribution
7.1.2 Development of natural gas industry
7.1.3 The basic positioning of natural gas market
7.1.4 The development model of natural gas market
7.1.5 The consumption of natural gas market
7.2 Operating conditions of natural gas market from 2011 to 2013
7.2.1 Development status of natural gas industry in 2011
7.2.2 Analysis of hotspots of natural gas industry in 2011
7.2.3 The operating characteristics of the natural gas industry in 2012
7.2.4 Analysis of natural gas consumption market in 2012
7.2.5 Brief introduction of the natural gas industry in the first half of 2013
7.3 Analysis of yield data of China’s natural gas products from 2010 to 2012
7.3.1 Analysis of yield data of natural gas of main provinces in 2010
7.3.2 Analysis of yield data of natural gas of main provinces in 2011
7.3.3 Analysis of yield data of natural gas of main provinces in 2012
7.4 Analysis of natural gas distributed applications from 2011 to 2013
7.4.1 Feasibility analysis of natural gas distributed applications
7.4.2 Forms and features of natural gas distributed energy systems
7.4.3 Differentiation in the applications of natural gas distributed energy system
7.4.4 Determination of the first batch natural gas distributed energy demonstration projects
7.4.5 Development direction of the application of natural gas distributed energy
7.5 Analysis of the supply of China’s unconventional natural gas from 2011 to 2013
7.5.1 Supply capacity of Chinese unconventional natural gas upgrades
7.5.2 Analysis of development approach of Chinese unconventional natural gas
7.5.3 Exploration and development mode of China’s shale gas
7.5.4 Development scale and development approach of China’s tight gas
7.5.5 Analysis of China’s CBM industry size and concentration
7.5.6 Optimistic development outlook of Chinese unconventional natural gas
CHAPTER 8 ANALYSIS OF POWER DEMAND OF DOWNSTREAM OF CHINA’S NATURAL GAS POWER GENERATION INDUSTRY CHAIN FROM 2011 TO 2013
8.1 Operating conditions of China’s power industry from 2011 to 2013
8.1.1 Summary of development of China’s power industry
8.1.2 China’s power industry achieved leapfrog development
8.1.3 Operating conditions of China’s power industry in 2011
8.1.4 Operating conditions of China’s power industry in 2012
8.1.5 Brief analysis of China’s power industry in the first half of 2013
8.2 Analysis of China’s power grid construction from 2011 to 2013
8.2.1 China started the construction of UHV power grid
8.2.2 China’s power grid construction has made great progress
8.2.3 Investment of China’s power grid construction in 2011
8.2.4 Investment of China’s power grid construction in 2012
8.2.5 Investment of China’s power grid construction in 2013
8.3 Analysis of financial condition of electricity supply industry in China from 2008 to 2012
8.3.1 Economic scale of China’s electricity supply industry from 2008 to 2012
8.3.2 Analysis of profitability index of China’s electricity supply industry from 2008 to 2012
8.3.3 Analysis of operating capacity index of China’s electricity supply industry from 2008 to 2012
8.3.4 Analysis of solvency index of China’s electricity supply industry from 2008 to 2012
8.3.5 Comprehensive evaluation of financial condition of China’s electricity supply industry from 2008 to 2012
8.4 Analysis of transacted electricity quantity of China’s power market from 2010 to 2013
8.4.1 Transacted electricity quantity of national power market in 2010
8.4.2 Transacted electricity quantity of national power market in 2011
8.4.3 Transacted electricity quantity of national power market in 2012
8.4.4 Implementation of new regulations on inter-provincial and trans-regional power transaction in 2013
CHAPTER 9 ANALYSIS OF NATURAL GAS POWER GENERATION EQUIPMENT MARKET IN CHINA FROM 2011 TO 2013
9.1 Gas turbine
9.1.1 Application market
9.1.2 Development characteristics
9.1.3 Pattern of enterprises
9.1.4 Technical progress
9.1.5 Prospects
9.2 Gas boiler
9.2.1 Structural characteristics and types
9.2.2 Economic analysis
9.2.3 Factors
9.2.4 Technical progress
9.2.5 Prospects
9.3 Generator
9.3.1 Market characteristics
9.3.2 The overall size
9.3.3 Competition pattern
9.3.4 Technical progress
9.3.5 Prospects
9.4 Transformer
9.4.1 The overall size
9.4.2 Market situation
9.4.3 Development situation
CHAPTER 10 ANALYSIS OF KEY ENTERPRISES OF NATURAL GAS POWER GENERATION EQUIPMENT MARKET IN CHINA FROM 2011 TO 2013
10.1 Dongfang Electric Co., Ltd.
10.1.1 Company profile
10.1.2 Operating status of Dongfang Electric in 2011
10.1.3 Operating status of Dongfang Electric in 2012
10.1.4 Operating status of Dongfang Electric from Jan. to Mar. 2013
10.1.5 Analysis of the core competitiveness of Dongfang Electric
10.2 Shanghai Electric Group Co., Ltd.
10.2.1 Company profile
10.2.2 Operating status of Shanghai Electric in 2011
10.2.3 Operating status of Shanghai Electric in 2012
10.2.4 Operating status of Shanghai Electric from Jan. to Mar. 2013
10.2.5 Analysis of the core competitiveness of Shanghai Electric
10.3 Hangzhou Boiler Group Co., Ltd.
10.3.1 Company profile
10.3.2 Operating status of Hangzhou Boiler in 2011
10.3.3 Operating status of Hangzhou Boiler in 2012
10.3.4 Operating status of Hangzhou Boiler from Jan. to Mar. 2013
10.3.5 Analysis of the core competitiveness of Hangzhou Boiler
10.4 Wuxi Huaguang Boiler Co., Ltd.
10.4.1 Company profile
10.4.2 Operating status of WHBC in 2011
10.4.3 Operating status of WHBC in 2012
10.4.4 Operating status of WHBC from Jan. to Mar. 2013
10.4.5 Analysis of the core competitiveness of WHBC
10.5 Suzhou Hailu Heavy Industry Co., Ltd.
10.5.1 Company Profile
10.5.2 Operating status of Hailu Heavy Industry in 2011
10.5.3 Operating status of Hailu Heavy Industry in 2012
10.5.4 Operating status of Hailu Heavy Industry from Jan. to Mar. 2013
10.5.5 Analysis of the core competitiveness of Hailu Heavy Industry
10.6 Financial comparative analysis of listed companies
10.6.1 Analysis of profitability
10.6.2 Analysis of growth capacity
10.6.3 Analysis of operating capacity
10.6.4 Analysis of solvency
CHAPTER 11 ANALYSES OF INVESTMENT RISK AND STRATEGY OF CHINA’S NATURAL GAS POWER GENERATION INDUSTRY
11.1 Investment Opportunities
11.1.1 Energy conservation and emission reduction opportunities
11.1.2 Smart grid opportunities
11.1.3 Continued growth of power investment
11.1.4 Encourage private capital investment
11.2 Investment risks
11.2.1 Policy risks
11.2.2 Funding risks
11.2.3 Market risks
11.2.4 Gas source risks
11.3 Investment strategy
11.3.1 Building risk prevention mechanism
11.3.2 Operating risk prevention strategies
11.3.3 Credit risk prevention strategies
11.3.4 BOT project risk-sharing strategies
CHAPTER 12 CICONSULTING’S ANALYSIS OF DEVELOPMENT TRENDS AND PROSPECTS OF CHINA’S NATURAL GAS POWER GENERATION INDUSTRY
12.1 CIConsulting’s forecast and analysis of supply and demand of China’s natural gas industry
12.1.1 Influence factors of natural gas supply and demand situation in China from 2013 to 2017
12.1.2 CIConsulting’s forecast of Chinese natural gas production from 2013 to 2017
12.1.3 CIConsulting’s forecast of Chinese natural gas consumption from 2013 to 2017
12.2 CIConsulting’s forecast of demand prospects of China’s power industry from 2013 to 2017
12.2.1 Analysis of China’s electricity demand situation in the “Twelfth Five-Year” period,
12.2.2 CIConsulting’s forecast and analysis of China’s power supply industry from 2013 to 2017
12.2.3 Forecast of Chinese economic growth and electricity demand in 2020
12.3 CIConsulting’s forecast of development prospect of Chinese natural gas power generaton industry from 2013 to 2017
12.3.1 Trends of Chinese natural gas power generation industry from 2013 to 2017
12.3.2 Outlook of Chinese natural gas power generation industry from 2013 to 2017
APPENDIX:
Appendix 1: “Regulation on the Administration of Urban Gas”
Appendix 2: “Guidance on the Development of Natural Gas Distributed Energy”
Appendix 3: “Twelfth Five-Year” Planning of natural gas development
Appendix 4: “Special Supervision Program of Safe Operation of Gas Turbine”